Interchange reconstruction on Poshtova Square, Kiev

For the construction of a new overpass within the reconstruction of an interchange on Poshtova Sq. (Kiev) plant “Oberbeton” produced pre-stressed concrete bridge beams length from 24 m to 30,7 m